Glossary entry (derived from question below)
Portuguese term or phrase:
chave seccionadora sob carga
English translation:
on-load disconnector
Added to glossary by
kashew
Jul 5, 2012 08:52
11 yrs ago
5 viewers *
Portuguese term
chave seccionadora sob carga
Portuguese to English
Tech/Engineering
Electronics / Elect Eng
No exterior do edificio deverao ser instaladas em estrutura apropriada as chaves seccionadora sob carga (uma para cada alimentador).
Within the description of a rectifier substation.
Within the description of a rectifier substation.
Change log
Jul 7, 2012 07:17: kashew Created KOG entry
Proposed translations
52 mins
Selected
on-load disconnector
http://www.railway-technology.com/contractors/electrificatio...
--------------------------------------------------
Note added at 53 minutes (2012-07-05 09:45:37 GMT)
--------------------------------------------------
Extract:
The DC distribution switchboards are in accordance with EN 50123-6 and IEC 61992-6 standards. It includes DC switchgears as feeder cubicles, rectifiers, negative and measure, on-load disconnectors, filter units, two-pole disconnector units, with withdrawable execution and the internal arc fault.
--------------------------------------------------
Note added at 53 minutes (2012-07-05 09:45:37 GMT)
--------------------------------------------------
Extract:
The DC distribution switchboards are in accordance with EN 50123-6 and IEC 61992-6 standards. It includes DC switchgears as feeder cubicles, rectifiers, negative and measure, on-load disconnectors, filter units, two-pole disconnector units, with withdrawable execution and the internal arc fault.
4 KudoZ points awarded for this answer.
Comment: "Thank you."
19 mins
loaded knife blade switch, knife blade switch under loading
knife blade switch:
https://www.google.com.br/search?hl=pt-BR&q=" knife blade sw...
chave seccionadora:
https://www.google.com.br/search?hl=pt-BR&q=chave seccionado...
Saluti!
https://www.google.com.br/search?hl=pt-BR&q=" knife blade sw...
chave seccionadora:
https://www.google.com.br/search?hl=pt-BR&q=chave seccionado...
Saluti!
27 mins
live isolating/cutt-off switch
Could do with more detail
+3
1 hr
on-load disconnect switch
Essa é minha área. Tenho um cliente que é uma refinaria onde há subestações e eles falam disconnect switch o tempo todo.
Coloque na web e veja as ocorrências.
Sob carga é on-load, enquanto sem carga é off-load
Coloque na web e veja as ocorrências.
Sob carga é on-load, enquanto sem carga é off-load
Peer comment(s):
agree |
Marlene Curtis
56 mins
|
Grato!
|
|
agree |
connie leite
2 hrs
|
agree |
Dr Lofthouse
4 hrs
|
Discussion